| Telemetry bit rate to
download the data once in 12 hours |
105 Mbits per sec |
| Ground station support |
Peenya, Lucknow, Car-Nicobar,
Mauritius, also stations in Brunei & Indonesia. Support from Bears
Lake and Wilheim needed in initial phases of ASTROSAT operations |
| Dedicated date links |
Between ISTRAC-TIFR and ISTRAC-ISAC
to transfer about 20 Gbytes of data per day. |
| Spacecraft |
3-axes stabilized with pointing
capability in any direction, having top deck of 1.8 m x 1.8 m and height
(along roll axis) of not less than 3 m |
| Orbit |
600 km altitude near circular
orbit with inclination
|
| Attitude control |
Pointing accuracy of
to
|
| Target acquisition accuracy |
Within one arc minute |
| Jitter in Pointing |
|
| Aspect Determination |
Post-facto accuracy of
read out every 2 sec. |
| Slew rate |
/min or better along any of the 3-axes. |
| Onboard Fuel for pointing |
Should last at least for 5
years. Should cover at least 1000 different target sources in 5 years
mission life, with requirement of multiple pointings at a give target at
different times. |
| Star Sensor |
2 Star Trackers needed for
ASTROSAT with the capability to detect 8th magnitude stars in visible band.
At least 3 stars in
FOV of each target. Baffle design such that any source with sun angle
is observable. |
| Thermal Control |
LAXPC :
to
C. |
| |
CZT :
to
C |
| |
SXT : CCD cooled by thermoelectric
cooler to
C |
| |
SSM :
to
C |